Newly Arrival Jigger Machine In Textile - Electric fabric roll and beam carrier – Singularity
Newly Arrival Jigger Machine In Textile - Electric fabric roll and beam carrier – Singularity Detail:
Application
suitable for 1400-3900mm series shuttle less looms
Beam loading and transport.
Features
Electric walking, electric hydraulic lifting, with high reliability,
Smooth operation, sensitive reaction, easy to control and other characteristics.
Weight: 1000-2500 kg
Applicable disc: φ 800– φ 1250
Lifting height: 800mm
Lifting height of heald frame: 2000mm
Applicable channel width: ≥2000mm


Specification
|
SL/NO |
Description |
Specification |
|
1 |
Operation Type |
Walking |
|
2 |
Speed |
0-5 Km/h |
|
3 |
Turning radius |
As Loom Width |
|
4 |
Loom Width |
R/S140-390cm |
|
5 |
Beam Diameter |
Φ800-Φ1250 |
|
6 |
Heightof Heald Frame |
880-1900mm |
|
7 |
Universal Wheel |
Φ150 Iron Core & PU |
|
8 |
Diver Wheel |
AC24V 1.6kW |
|
9 |
Power System |
DC24V 2kW |
|
10 |
PLC |
SIEMENS |
|
11 |
Servo Controller |
CURTIS |
|
12 |
Battery |
3-D-210ah |
|
13 |
Charger |
DF-2425 24V25A |
|
14 |
Oil Cylinder |
Φ80 |
|
15 |
Loading Capacity |
2000 KG |
|
16 |
Passage Width |
≥1600mm |


Product detail pictures:
Related Product Guide:
We insist on offering premium quality manufacturing with superior business concept, honest product sales as well as finest and fast assistance. it will bring you not only the good quality product or service and huge profit, but the most significant is to occupy the endless market for Newly Arrival Jigger Machine In Textile - Electric fabric roll and beam carrier – Singularity , The product will supply to all over the world, such as: Chicago, Cape Town, Greece, We pay high attention to customer service, and cherish every customer. We have maintained a strong reputation in the industry for many years. We are honest and work on building a long-term relationship with our customers.
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.





